Scale

Cu Jut Solar Power Plant Project is built in Ea T'ling town, Cu Jut district, Dak Nong province, with a capacity of 50 MWAC; average power output is 94.71 million kWh, with a total investment of 1,367 billion VND; The project has been implemented since June 2017 by EVNCHP as an investor. In this project, TECHGEL cooperates with General contractor Sumec Complete Equipment & Engineering Co., ltd to implement the EPC package.

 